• Home
  • Design Ideas
  • How Long Does a Kitchen Remodel Really Take? Philly Kitchen & Bath Explains

One of the first questions we hear from homeowners in Northeast Philly, Roxborough, and Mount Airy is: “How long will my kitchen remodel take?” The truth is, timelines vary based on the scope of work, material availability, and the condition of your existing kitchen—but with the right contractor, the process can be smooth, efficient, and even enjoyable.

At Philly Kitchen & Bath LLC, we pride ourselves on transparency and expert planning. Here’s what you need to know to set realistic expectations and get the most out of your remodel.


Typical Kitchen Remodel Timeline

While every project is unique, here’s a general breakdown of the remodeling timeline:

  1. Consultation & Design (1–2 weeks)
    • Site visit, budget planning, and layout discussions
    • Material selection (cabinets, tile, countertops, etc.)
  2. Permitting & Procurement (1–3 weeks)
    • If required, we’ll handle permits through the Philadelphia L&I department.
    • Orders are placed for appliances, cabinetry, fixtures, and tile
  3. Demolition (2–4 days)
    • Removal of existing cabinetry, appliances, and surfaces
  4. Rough-In Work (1–2 weeks)
    • Electrical, plumbing, HVAC adjustments
    • Framing (if layout changes)
  5. Installation Phase (2–4 weeks)
    • Cabinets, tile installation, countertops, appliances, painting
  6. Final Touches & Inspection (1 week)
    • Punch-list items and walkthrough
    • Clean-up and final inspections

Average full remodel: 5–8 weeks, depending on the kitchen size and complexity.


Common Timeline Disruptors

  • Special Order Materials: Custom cabinets or imported tile can cause delays.
  • Unforeseen Structural Issues: Water damage or outdated wiring often needs correcting.
  • Permit Delays: We mitigate this risk by submitting paperwork early and staying up-to-date with city regulations.

Remodeling in Northern Liberties, Mount Airy & Beyond

We recently completed a full kitchen remodel in Northern Liberties that involved relocating the sink and range, adding an island, and installing floor-to-ceiling tile backsplash. Thanks to careful planning, we completed it in 6.5 weeks—right on schedule.

In Mount Airy, a smaller galley-style kitchen remodel with new cabinetry and tile flooring wrapped up in just under five weeks.


Why Choose Philly Kitchen & Bath LLC

  • Over a decade of experience in Philadelphia’s unique housing stock
  • Local familiarity with city permitting and historic home considerations
  • Custom cabinetry, tile installation, and modern layouts designed to maximize space
  • Trusted by homeowners across Roxborough, Northeast Philly, and beyond

Client Insight

“They were honest from day one about how long things would take. They actually finished our project a few days early, and the quality was top-notch.” — Melissa H., Roxborough


Conclusion

The key to a stress-free remodel? Realistic expectations and a trusted team. At Philly Kitchen & Bath LLC, we make it our mission to keep you informed, involved, and inspired at every step.


📞 Call to Action
Thinking about remodeling your kitchen this summer or fall? Let’s start the planning now. Contact Philly Kitchen & Bath LLC for a consultation and personalized estimate.

Share this post

Subscribe to our newsletter

Keep up with the latest blog posts by staying updated. No spamming: we promise.
By clicking Sign Up you’re confirming that you agree with our Terms and Conditions.

Related posts

At Philly Kitchen & Bath, we are dedicated to transforming your kitchens and bathrooms into stunning, functional spaces tailored to your lifestyle.

Help

Social Media